INSTALLATION OF THE BODY OF THE TOWER

FRP cooling towers should be installed in places with proper ventilation. Proper ventilation is essential for the tower to perform at its utmost capacity and produce the cooling effect neutrally. When the body of the cooling tower is to be installed, the water pump takes the water from the tank and sends it to the tower. Once the water is cooled, it flows from the bottom, collecting down into the condenser.

It is because of such intricate cases that the FRP cooling tower manufacturers share the drawing for study before trying the physical work. Make sure the alignment is straight the equipment is firm, stable and the direction position of the outlet pipe and a cooling tower nozzle is placed on the correct areas. There may be instances where the nozzle and the outlet pipe are placed in the opposite direction or place of each other. Check out the drawing carefully before taking the final ste

THE INSTALLATION PROCESS OF THE FRP COOLING TOWER

A cooling tower is a cooling gadget, which makes use of the evaporative cooling of water mechanism and produces cool air in areas that require the dissipation of high amounts of heat, for example – manufacturing industries. The process of operating a cooling tower can be cost-effective if the installation and maintenance are carried well. In this article, we shed some light on the best ways to install an FRP cooling tower.

REQUIREMENTS OF FRP COOLING TOWER INSTALLATION

No matter the type of cooling tower being installed, it depends on several conditions and equipment used by the cooling tower manufacturer. The FRP cooling tower manufacturers make it important to consider conditions like the ground, its load capacity, the location of installation, which are all of utmost importance. Individuals attending the installation of FRP cooling towers should pay much attention to the foundation of the cooling tower, the horizontal steel plate, its size, and the elevation level of the base points.

While you begin installing the FRP cooling tower, make sure it is placed horizontally when the water is installed. Take special note of the chassis, it is important to have someone stepping on the rope of the chassis, to make sure the chassis does not crush.

Cooling tower suppliers deliver the entire package consisting of pipes, bolts, and nozzles. The nozzles are available in three types to help the water distribution process. In the first case, the water distribution pipes can be assembled with slits. In the second type, the water distribution can be performed using nozzles, and thirdly a water distribution pipe with a round hole can be equipped and installed in a single row by ensuring that the angle between the hole and the horizontal direction is 30°. If you prefer installing it in the double draw installation process, make sure the angle of 60°.

 

INSTALLATION OF THE BODY OF THE TOWER

Cooling towers should be installed in places with proper ventilation. Proper ventilation is essential for the tower to perform at its utmost capacity and produce the cooling effect neutrally. When the body of the cooling tower is to be installed, the water pump takes the water from the tank and sends it to the tower. Once the water is cooled, it flows from the bottom, collecting down into the condenser.

It is because of such intricate cases that the Cooling tower manufacturers share the drawing for study before trying the physical work. Make sure the alignment is straight the equipment is firm, stable and the direction position of the outlet pipe and a cooling tower nozzle is placed on the correct areas. There may be instances where the nozzle and the outlet pipe are placed in the opposite direction or place of each other. Check out the drawing carefully before taking the final step.